ISO 9001:2008 standard of quality management system. The documents are provided. To perform the effect. Maintaining and developing it to effectively. Ongoing requirements are specified in international standard
1. Quality management systems - General requirements must be
- the document management requirements.
2. Responsible management - management must be committed
- Responsibilities , Authority and communication
- the key to the client
- a review by the management - to provide quality policy
- Planning |
 |
3. Quality management resources - must be ready resource
- the resource persons
- fundamental To consider. Providing and maintaining the basic factors that need to be the product requirements.
4. Building products - plans to build a product
- related processes and customer requirements
- Design and product development. Separated as: Planning, design and development, information design and development, the design and development, reviewing design and development, the iteration of design and development, design approval and development, control, Design and Development
5. With the manufacturing and services
- must be well controlled in the manufacturing and service
- with the approval of manufacturing and services
- must be the property of the customer care at all times - as nourishing treatment product. Terms
6. Control and Monitoring Tools Scheduled to consider the Monitoring and measuring the necessary action. Includes the tools necessary for keeping track.
7. The measure is to improve analysis - Monitoring and measurement Customer satisfaction must be
- must be within Monitoring
- Monitoring and measurement procedures
- Monitoring and measurement products - products that do not have control requirements
- data analysis
- continuous adjustment factors
- action
-oriented change. |
ISO 14001:2004 is a standard key management system which Specify requirements for preparation and maintenance. Environment that meets the requirements of ISO 14001:2004 basic principles need to be seized.
1. General requirements - must be prepared to document compliance to maintaining and improving the ongoing - and want to show the scope of the document management system Environmental policy Environmental
- To corporate and environmental policies must be that some in the environmental management system boundaries. |
 |
2. Planning - environmental problems manner.
:to provide and maintain compliance to practices that make
:to update these documents to modern
: must always ensure that the characteristics are significant environmental problems that these Has brought in to determine practices
- laws and other requirements to provide compliance and to maintain that practice
- the goal and objective to make plans to perform must include measures to choose. Different business process requirements and perspectives of stakeholders who have.
3. practices and operations - the role of resources, responsibility doctrine. And authority. To ensure the sufficiency To practice - the ability and training to provide awareness training. Necessary to achieve this - the communication must be prepared to do it, and maintaining practices
- Documentation To document the objectives and policy goals. Including environmental limits - process control. To plan for activities relating to the environmental significance
- preparing and responding to the emergency and prepare to perform a periodic review.
4. Testing - Monitoring and measurement Practices to prepare a written document. For Monitoring and Measurement regularly - evaluating consistency Must store the results of periodic assessments - that are not consistent and the corrective and preventive. Must ensure that any changes necessary for environmental management - to control the recording. Must create and maintain a record required.
- Monitoring. Must ensure that monitoring of the dive to the planned period - review of management. Environmental Services to review the system time has been set. To ensure that environmental management systems, this is still appropriate and sufficient and effective. Ongoing
|